Relevant Contract Experience
Victoria Road Ashford Kent - Volkerfitzpatrick
Thames Water adaptable filter drainage to relive water from carriageway. 27 way EDF ducting encased in CBS. BT ducting and vital Energi to provide hot water to proposed industrial unit.
Whiteland Farm Bicester - J Breheny
Completed housing development drainage package.
East Kent Access Road, Ramsgate, Kent - Fitzpatrick/Hoctieff
This project consists of all mainline drainage - 5 metres deep, large concrete pipe outfalls, storm water attenuation areas, linear soakaways etc for which CP Dynes is the subcontractor for the entire drainage chambers.
LPR Southpark Olympic Village ODA, Stratford - Skanska
This project consists of concrete, clay and plastic pipes all with varying depths in contaminated ground.
Summerhill Waste Water Treatment Plant - SIAC Construction
This project consists of deep foul/storm main in bad ground conditions for the waste water treatment plant in running sand. 8-10 metres deep.
M25 Junction 16-19 Widening works - Skanska Balfour Beatty
This project consists of 12 miles of mainline drainage - 6 metres deep, large concrete pipe outfalls, storm water attenuation areas, linear soakaways etc for which CP Dynes is the subcontractor for the entine drainage package.
Neats Courts, Isle of Sheppey - Bam Nuttall
Infrastructure work for foul and storm drainage for an overflow car-park for an import pound, 5 metres deep.
Olympic Village Stratford - Fitzpatrick
Work here commenced in late 2008. It consists of both storm and foul water drainage. The package included attenuation areas, gullies, manholes, catch pits and access chambers along with connection's to and from existing. This again was deep drainage - 8 metres deep.
Chatham High Street, Medway - J Breheny
Drainage and Remedial works which also included Roadworks.
M1 Junction 6a - 10 - Balfour Beatty Skanska Joint Venture
CP Dynes were the only drainage subcontractor for the entire 30 mile long mainline. Our work on this averaged 6m in depth. Amogh the carrier/filter drains there were also attenuation areas, culverts and headwalls etc.
Tobbermaclugg, Dublin - Siac
Large bore storm drainage through granite rock to include culvert outfalls, 6 metres deep.
Swanstree Avenue Link Road, Sittingbourne - J Breheny
Infrastructure work for storm drainage for both foul and storm water, averaging 3-4 metres deep including PCU.
Dagenham Docks - Birse Civils Ltd
Main fould and storm in-line replacement major over-pumping involved.
A228 Leyborne and West Malling Bypass - Birse Civils Ltd
Highway drainage up to KCC standard, large deep bore soakaway up to 8 metres deep.
Rushley Platt Farm Industrial Estate - Fitzpatrick Contractors Ltd
Main foul and storm infrastructure drainage for housing development at 8 metres deep.
Rochester Riverside - Edmund Nuttall Ltd
Large concrete outfall pipes and pumping main ductile iron pipes at 5 metres deep, tested to Southern Water standards.
Charles Babbage Road, Cambridge - Jacksons Civil Engineering Ltd
General drainage package.
Whitecliffs Honeywood Way, Dover Ringway
Deep bore soakaways at 8 metres deep including infrastructure drainage storm and foul.
Birmingham Airport - Fitzpatrick Contractors Ltd
Contract involved large bore concrete 10 lagre diameter interceptors side by side, depth ranges 5-6 metres.
East Midlands Airport - Fitzpatrick Contracttors Ltd
Deep and shallow drainage and overside interceptors.
Colchester Garrison - Lagan/Keltbray
Infrastructure package including ducts.
-
Suction Excavator
Our latest machine to our fleet safely removing many types of debris quickly, reducing the time required for removing material around delecate electrical cabling or pipework.
Read More... -
Fleet in Action
See our fleet of machinery that we use on construction sites throughout the United Kingdom. Our newest addition is a Scania R730 lorry complete with C P Dynes livery.
Read More... -
Training Policy
We operate regular updating of NVQ qualifications for all employees and encourage all staff to undergo any training that will be beneficial to themselves, CP Dynes and the main Contractor.
Read More... -
Health & Safety Policy
At CP Dynes we consider health & safety performance to be of prime importance to our business and we are totally committed to continual improvement in these areas.
Read More...